Skip to content

Industrial · Process / generation

4–20 mA / HART loop check to SCADA

Work the team has performed.

Motor control center and industrial electrical

Full-chain verification of field transmitters — six span points, HART diagnostics, the same value confirmed on the operator screen.

  • — Linearity, not only zero and full scale
  • — HART PV / LRV / URV and tag check
  • — As-found / as-left on the loop folder
Submit an industrial RFQ